The first being the design and specification of equipment together with a detailed document pack. The second part of the installation is for the infrastructure racking, cabling and bracketry. The final part is the installation and commissioning of the equipment. Harp allocates a dedicated project manager to see the task through from end to end ensuring that knowledge is maintained from the start to the end of the project.
|